多项选择题
You are designing a test environment that uses Hyper-V. The test environment must enable testers to perform the following tasks:
Quickly switch between running states.Re-create a specific state or condition.Return the state of the environment to a specific point in time.Recover from a faulty software update by using the fastest method. You need to ensure that the test environment meets the requirements.
What are two possible tools that you can use to achieve this goal?()
A.Hyper-V Manager
B.Microsoft System Center Data Protection Manager (DPM) 2007 with SP1
C.Microsoft System Center Virtual Machine Manager (VMM) 2008 R2
D.Microsoft System Center Configuration Manager (SCCM) 2007 with SP3
相关考题
-
单项选择题
You are designing a Windows Server 2008 R2 Hyper-V environment. You need to be able to dynamically assign new storage to Windows virtual machines (VMs). What should you do?()
A.Use fixed virtual hard disks (VHDs)
B.Install Hyper-V Integration Services on the VMs
C.Install the VMs in Cluster Shared Volumes (CSVs)
D.Use dynamically expanding virtual hard disks (VHDs) -
单项选择题
You are designing a Windows Server 2008 R2 Hyper-V virtualization environment. Your host servers must have the following elements: A dedicated management network adapter.A dedicated virtual network for child iSCSI network traffic.A dedicated virtual network for child network traffic with VLAN tagging. You need to choose adapters that minimize the host server processing. Which adapters should you choose?()
A.three network adapters that support 802.1p
B.two network adapters that support 802.1q, and one iSCSI host bus adapter
C.two network adapters that support 802.1p, and one network adapter that supports TCP Chimney
D.two network adapters that support 802.1q, and one network adapter that supports Jumbo frames -
多项选择题
Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to install an application upgrade. Testing the production application requires access to the following three virtual machines (VMs): a domain controller, a server that runs Microsoft SQL Server, and an IIS Web server. You need to test the application upgrade in a virtual environment that is isolated from the production network. Which two sets of actions should your plan include?()
A.Pause the three VMs, and copy the .vhd files to the test environment
B.Create a checkpoint of the three VMs, and export the checkpoint to the test environment
C.Import the checkpoint into the test environment, and apply the application update for testing
D.Create three VMs in the test environment, attach the existing .vhd files, and apply the application update for testing
