单项选择题
In the cargo winch, spur reduction gearing transfers the motor drive to ().
A.the toping light
B.the board brake
C.the fail-safe
D.the barrel shaft
点击查看答案&解析
相关考题
-
单项选择题
For occasional heavy loads, two cranes can be arranged to work together. The operating () for deck crane motors may be hydraulic electric.
A.principle
B.medium
C.instruction
D.voltage -
单项选择题
In a general cargo crane, three principal movements are (); (); ().
A.hoisting;luffing;slewing
B.lifting;raising;lowering
C.rotating;raising;handling
D.hosting;lowering;moving -
单项选择题
A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().
A.length
B.slack
C.height
D.rotation direction
